Scale-X Magnetic Fluid Conditioners



---- Home ----


Paraffin Control Questionnaire (General)
[ Organic Scale ]

Either - Complete the following questionnaire and select "submit", 
or - download the questionnaire in Microsoft Excel format using the facilities provided at the bottom of this page and return by email. 


Paraffin Control Questionnaire (General)
[ Organic Scale ]
For Elimination of Paraffin and/or Organic Scale from a Liquid System


Return to
Magnetic Technology Australia

PO Box 864,  Frankston 3199
Victoria,  AUSTRALIA.

Ph   +61 (0)408 394 151   or    +61 (0)3 9770 0556
Fax   +61 (0)3 9770 1700  or   Email 
sales@scale-x.com


Please provide as much information as is available

Contact Data
Company Information
Name   Address
City        State     
Zip or Post Code                Country   
Company Web Site
Type of Operation

 

Contact Information
Name     Position
Phone   Fax    
Email


Project Information

Name             Status
Location
Application

Process Data

System Operating Parameters

    Minimum               Normal                  Maximum           Units
System Liquid Flow Rate
Operating Pressure
Operating Temperature
Solids Content or Concentration 
Main Liquid Density (sg)
Paraffin Deposition Temperature
Cloud Point Temperature 
Bubble Point of Liquid
Liquid Paraffin Content
Pour Point Temperature


Fluid Details
Description of fluid(s) to be treated


Is flow constant or batch
Is the flow recirculating or once through
Main Liquid Component

Paraffin and/or Organic Scale Details & Related Process Equipment  
Supply a fluid system process flow chart and schematic diagram, in Acrobat or MS Office format, showing paraffin forming points in the system (in pipes, vessels, valves, pumps, control/pressure reduction devices, cooling towers, etc...), function of each vessel and/or device and length of pipe runs between vessels, etc..  Attach the schematic to the email facility provided below this form or fax to International +61 (0)3 9770 1700.


Paraffin and/or Organic Scale Details


Types of paraffin(s) and/or Organic Scale(s) and chemical composition


Are paraffin inhibitors currently used
Types of paraffin inhibitors used and dosage


Most severe scaling point
Paraffin hardness - hard or soft    Paraffin thickness
Rate of paraffin formation - time to build up a given thickness

Paraffin is forming in:
Vessels (includes heat exchangers, separation vessels, process vessels, clarifiers, etc...)
Cooling towers
Pipes
Valves
Pumps
Control/pressure reduction devices
Other

System Conditions Causing Scale
Is temperature change involved
Is heat transfer involved
Is evaporation taking place
Is a chemical reaction taking place
Is a pressure reduction involved
Is a gas being liberated as a result of pressure reduction
Composition of gas liberated

Location of all Paraffin Build Up Points


Description of main contributing factors to paraffin build up

Maintenance Procedures and Cleaning Regime
Paraffin cleaning frequency
Length of outage to remove paraffin

How is paraffin removed - cleaning procedure

The Equipment
Pipe size before each paraffin build up point


Type of pipes - thick walled, thin walled, mild steel, stainless steel, copper, pvc, rubber, etc....


Description of the function of each item of equipment

Desired Outcomes
Description of operational objectives for installing Scale-X MFC's and desired outcomes



Describe main problem requiring action    (Attach diagrams)



Check List:-
The following details have been included on the fluid system schematic diagram:
All vessels (including heat exchanger, separation vessels, process vessels, clarifiers, etc...)
All cooling towers
All pipes
All pipes outside diameter is shown
All valves in the fluid flow path
All pumps 
All fluid control devices or pressure reducers, etc..
Length of fluid path between vessels, pumps, valves, control devices, etc...
Description of function of each vessel, control device, etc...
Location of all paraffin build up points in system




Download Questionnaire

To Download the Questionnaire (in Microsoft Excel format) and Then Email It Later

To download the questionnaire file, right click on questionnaire, select "Save Target As" and nominate the folder to which you wish to save the file, then select "save".  Open the file "Paraffin Control General Questionnaire" and complete it.  Email the file to Magnetic Technology Australia as an attachment.


To Email (or fax) Fluid System Schematic Diagram

Email schematic to Magnetic Technology Australia as an attachment in an Acrobat, JPEG or MS Office format or fax to International +61 (0)3 9770 1700.

---- Introductory Page ----

back to top

 


Home  |  MTA Profile  |  Product  |  Applications  |  Technical  |  Technical Papers  |  Enquiries

Magnetic Technology Australia
Ph +61 (0)408 394 151  or +61 (0)3 8684 9690
Email
sales@scale-x.com

© Copyright 2001 PS Australian Promotions Pty Ltd  ABN 83 006 930 098